Skip to documentation
Cognigate CloudCOGI. Documentation
Manage

Projects & creative library.

Every brief becomes a project. Every successful output becomes an asset. Understanding the difference saves you from losing work — and from wondering where a generated file went.

9 minute readOrganisationDownloads and retention

Projects are saved briefs

A project is created the moment you queue a generation. It stores the brief, the selected business and product, the objective, the platform, the aspect ratio, the creative direction, and a reference file name if you attached one. It also keeps a record of every job created from that brief.

This is useful in three situations:

  • You want to make a variation next week without retyping the whole brief.
  • A generation failed, and you want to retry without losing the context.
  • Someone asks what you actually asked for when a campaign was made.

Finding your work

The Projects page lists everything you have saved. You can search by project name, filter by format, and open any project to see its detail. If the list is empty, you have not queued a generation yet, or the workspace is showing sample content.

The Studio page shows a shorter view: recent campaigns and drafts. The Home dashboard shows recent activity. All three lead to the same project records.

Inside a project

  1. The brief

    Your original written instruction, plus the business and product context attached at the time. This is the reference for what the output was meant to be.

  2. Generated content

    Each job created from the project appears with its status. Succeeded jobs show their output; failed jobs show an error state. This is the honest history of the campaign.

  3. Settings

    The format, direction, and platform recorded with the brief. Useful when you need to recreate the same look.

  4. Campaign assets

    The files produced for this project, with a download action. If there are more than five, a link opens the full Assets library.

  5. Campaign stats

    These are production statistics — total generations, completed, and in progress. They are not advertising performance, reach, clicks, or sales.

Continuing a campaign

Continue campaign opens Create with the project’s kind and original brief already filled in, and keeps the project association. This is the fastest way to make a variation.

Treat the prefilled brief as a draft, not a finished instruction. Change one thing at a time — the subject, the light, the audience, or the format — so you can tell what made the difference. If you change everything at once, you learn nothing and waste credits.

The Assets library

Assets is where generated files live. It shows the file name, format, size, and a preview where possible. You can search, filter by format, and download individual items.

What is stored

Images, video clips, and audio produced by successful jobs. Files are held in private storage and served through short-lived secure links.

What is not stored

Your finished edited ad, your logo overlay, or a combined multi-scene video. Those exist only after you finish them in another tool.

Download links expire

A download link is generated when you ask for it and is valid only briefly. If a link stops working, return to Assets or the project and request a new one. Download the files you intend to keep rather than relying on the library as a permanent archive.

Job activity

Job activity is the production log. It shows each generation with its kind, status, and time. Use it when:

  • A result page was closed before the job finished.
  • You want to confirm whether a failed job was retried.
  • You need to see how many attempts a campaign took.
  • Credits seem lower than expected and you want to match them to jobs.

A job that fails for an infrastructure reason releases its credit reservation. A job that succeeds settles the cost. See credits and plans for the detail.

A simple filing habit

  • One project per offer or product launch, not one per week.
  • A name that includes the offer and the channel.
  • Download the chosen output before you start editing.
  • Keep the final published text in the project notes or your own document.
  • Delete or ignore experiments rather than mixing them into the campaign of record.
  • Once a month, review which projects you actually reused.

Open your projects or browse the asset library.